Millennium Change Account Sap User Manual카테고리 없음 2021. 6. 8. 04:53
- Account manager’s user account is automatically created as an SAP Fieldglass Administrator account. Administrators have access to everything within their supplier account and can create additional supplier user accounts. Newly created users will receive two emails regarding SAP Fieldglass registration: SAP Fieldglass Registration Emails.
- SAP Help Portal.
- Table/view: T001/VT001. You can create a company code in two ways: EECopy an existing company code and then change the necessary settings (e.g., the company code description, the currency, etc.).
This applies to customers who have licensed an SAP cloud product. Cloud administrators have all authorizations that are required to fulfill all SAP cloud-related tasks in the SAP ONE Support Launchpad at the highest possible level. SAP creates the first S-user for new cloud customers and assigns this user these authorizations.
Hello All,
I was facing an issue regarding the necessity to edit the reconciliation account derived from the customer/vendor data without using a SGL indicator.
Many SCN discussion confirm that it’s not possible as in standard the GL account is derived from the customer/vendor master data, nevertheless, there is a “standard” way (no specific development) to edit and select the reconciliation account we need during posting and without using the SGL indicator:
Here is the steps :
- First, specify your GL accounts that you want to choose from, for example let say Recon. Accounts
- 41110010 (entered in customer master data)
- 41110011
- 41110012
2. check the box on GL account masetr data (Create/bank/interest TAB) “Reconcil.acct ready for input” (Tcode FS00)
3 . If this option is not visible, change your Field status group of your Account group (Tcode OBD4) in “Document entry”
4. Go to transaction S_ALR_87002480 to customize your entries :
For each GL account that will be derived form the customer master data, enter the possible entries you need
That’s All 🙂
Now when your are posting with FB01 or FB70 for customers invoices, you will have the possibility to change the reconciliation account, the field is editable 🙂
but only accept the GL account entered in the table above (step 4).
My posting can look like :
And GL view :
Voila !
I hope it helps 🙂
Tamim
Dear SAP Experts,
Some companies have not prepared the documentation for the user guide of SAP Purchase Order but this document should always be in your folder.
Every company has a different system with their custom developments but the below fields might be familiar.
Sincerely,
Beste
Summary
The aim of this document is creating and changing Purchase Order (after now PO). POs can be created by two ways. One of them is creating PO manually without a PR. Second one is creating by using an assigned PR.
Table of Contents
1.Creating Purchase Order
1.1.Manually Creating Purchase Order
1.1.1.In case of a SKU (Material with a code)
1.1.2. Purchase Order for Assets
1.1.3. PO for Items to be Purchased for a Project
1.2.Creating PO Via Requisition (PR) Assignment List
2.Changing PO
3.Confirmations
4.Displaying PO
1.1. Manually Creating PO
POs can be created in the system Without taking any reference, PR.
Following SAP Menu
Logistics -> Materials Management -> Purchasing -> Purchasing Order -> Create -> Vendor/Supplying Plant Known
Transaction Code
ME21N
By following the above menu path or typing the transaction code ME21N in transaction bar, below screen is opened.
Proper document type is chosen from the upper left side of the screen.
After selecting proper PO document type, vendor code is entered in “Vendor” field. If vendor code is not known, it can be searched by using F4 in the “Vendor” field. After pressing F4, below screen is opened.
Vendors can be filtered by below fields.
By pressing button vendor list is obtained. Proper vendor is chosen from the list and the “enter” button is used to bring the vendor into PO.
After vendor selection, “Purchasing Organisation”, “Purchasing Group” and “Company Code” fields under “Organizational Data” section are filled. Proper Purchasing Group can be chosen.
After fixing the above mentioned fields, by pressing enter, payment terms, Incoterms and currency data related with the vendor are automatically brought into PO from vendor master data. But, these data are subject to change if required.
If this is a PO for a SKU, material code is typed in “Material” cell. If not, material description is typed in “Short Text” cell. Then, price, quantity and Plant information are typed in the related fields.
1.1.1. In case of a SKU (Material with a code)
From the master data of the material, material group, storage location, delivery date, unit information are automatically adopted. After typing the price information, by pressing button, PO is checked for any problem. If there is not any problem message, by pressingbutton, PO is saved and a PO number is generated by the system.
1.1.2. PO for Assets
Firstly, vendor and organizational data are filled. Then, after choosing proper material group from the list, Acc. Assignment Cat. is chosen as “A”. Then, PO quantity, delivery date and price information are entered to the related fields.
For Account Assignment, if the item is purchased from domestic market (Standard PO), “Asset” field is set as “DUMMY” or any dummy code which is your company used. If this is an import subject, an asset number is obtained from Accounting Department and then this number is entered in “Asset” field.
After completing all necessary fields, PO is checked for any problem message by clicking button . Then, PO is saved by clickingbutton. A PO number is generated by system.
1.1.3. PO for Items to be Purchased for a Project
Firstly, vendor and organizational data are filled. Then, after choosing proper material group from the list (if this is a purchasing for a non-SKU item), Acc. Assignment Cat. is chosen as “P”. Then, PO quantity, delivery date and price information are entered to the related fields.
After choosing Acc. Assignment Category as “P”, on item basis G/L Account and WBS Element selections should be written properly and respectively.
After completing all necessary fields, PO is checked for any problem message by clickingbutton . Then, PO is saved by clickingbutton. A PO number is generated by system.
1.2. Creating PO Via Requisition (PR) Assignment List
This way of creating PO is the mostly used one. It is the way to create PO with assigned PR documents. Many of the information comes from the assigned PR.
Following SAP Menu
Logistics -> Materials Management -> Purchasing -> Purchase Order -> Create -> Via Requisition Assignment List
Transaction Code
ME58
By following the above path or directly typing the transaction code ME58 in transaction box, below screen will be opened:
In this screen, it is possible to filter assigned PRs with respect to different parameter. After filtering and executing this selection(s) with button , we will reach below screen view on which requested PRs are displayed.
By double clicking on the expression “W/o Outl. Agmt” below window is opened. Proper PO document type is choosen and purchasing group and purchasing organization fields are entered properly if not filled. Then, by clickingbutton, our settings are brought into PO creation screen.
By picking the PR request on the left side and moving it into the basket, all information in the PR are brought into PO document:
WARNING: It is strictly recommended that after bringing PR into PO, currency, prices, payment terms, delivery terms and other data coming from vendor master data to be checked specifically for the new PO. This is because those information are master data but one can create a PO for the selected vendor with different terms and conditions.
If we want to change the delivery date, it is required to change the in the “Statistical Delivery Date” field under “Delivery Schedule” section. For import POs, this date represents the delivery date of the vendor with respect to delivery terms. For example, if this would be a FCA delivery, then, the date in “Statistical Delivery Date” represents the date that vendor will deliver the goods at the delivery point. However, date in the “Delivery Date” field represents the date that the item will be in your company’s stocks.
Generally, “Delivery Date” should not be changed. Instead, one can manage delivery date of the item to your company’s stocks by changing confirmations. Confirmations will be shown later.
After completing all necessary fields, PO is checked for any problem message by clickingbutton . Then, PO is saved by clickingbutton. A PO number is generated by system.
This transaction is used to make changes in a previously created PO.
Following SAP Menu
Logistics -> Materials Management -> Purchasing -> Purchase Order -> Change
Transaction Code
When the unit is operating in fan mode, the window kit and exhaust hose do not need to be installed. MOUNTING THE EXHAUST HOSE. Soleus air 10000 btu user manual. Choose a suitable location, near a grounded electrical outlet and suitable window or door.
ME22N
By clicking the transaction on the list, below screen is opened:
Always, last created/saved PO will be brought in the screen. To display a different PO, by clickingbutton, required PO number is written andbutton is clicked.
After completing all changes, PO is checked for any problem message by clicking button . Then, PO is saved by clickingbutton.
After forwarding PO document to the vendor, confirmation data received from the vendor is stored in the system. For this action, again, PO change transaction is used. Confirmations are seen by planning department via “Stock/Requirements List” screen (MD04) and production plans are made according to confirmed delivery date(s) and quantities.
Feb 10, 2019 We reach the end of this post. Those were the best Wireshark alternatives for android that you can download for free on Google Play. Read: 5+ Best Apps to Open DOCX on Android Do you use another app similar to Wireshark on Android? Let me know in the comments section to add it to the list. Wireshark Android Apk is developed and offered by Wireshark. It is a free business category app. It rated for 3+ and the support version of Android is 16 and above. The latest and current download version of the app is 1.2. It lastly updated on 13 December, 2016. Wireshark free download for android. 18 rows Explore our download area or look in our third party package list below. Installation Notes. For a complete list of system requirements and supported platforms, please consult the User's Guide. Information about each release can be found in the release notes. Each Windows package comes with the latest stable release of WinPcap, which is required for live packet capture. Wireshark Download is best tool to quickly capture analyze network packets and also display all of the detailed info about the packets.
Following SAP Menu
Logistics -> Materials Management -> Purchasing -> Purchase Order -> Change
Transaction Code
ME22N
Before saving the confirmation information, planning departments will see PO item stock availability date as 29.07.2015 (29.07.2015 + 0 days for material quality control (this data is defined in material master data)).
By default, Confirmation Control Key is selected; it is defined in vendor master data. To enter confirmation data, first, under “Confirmations” section, “AB-Order Acknowledgment” is chosen in CC (Confirmation Category) field. Then, delivery date confirmed by vendor is typed in “Delivery Date” field and quantity is entered in “Quantity” field. And, by pressing enter (skipping yellow warning messages), confirmation information are set.
IntroductionChapter 1: Tune-up and routine maintenanceChapter 2: Part A: 3.5L V6 engineChapter 2: Part B: General engine overhaul proceduresChapter 3: Cooling, heating, and air conditioning systemsChapter 4: Fuel and exhaust systemsChapter 5: Engine electrical systemsChapter 6: Emissions and engine control systemsChapter 7: Part A: Manual transmissionChapter 7: Part B: Automatic transmissionChapter 8: Clutch and drivetrainChapter 9: BrakesChapter 10: Suspension and steering systemsChapter 11: BodyChapter 12: Chassis electrical systemWiring diagrams. Free haynes manual download.
After entering confirmation data, planning will see the PO item as below:
It turns out that item will be available for production on 10.08.2015 (01.11.2012 + 0 days for material checks). Since this will affect production plans, it is important to inform planning department about such change before or just after entering the confirmation data. For import PO, confirmation data which are stored in this way again represents the item’s delivery date to Evyap stocks. But, this time this date is an estimated date because it depends on freight period, custom clearance operations and in-land freight periods.
After all, if all confirmation data is set, then by clickingbutton, changes are saved.
This transaction is used to display a previously created PO.
Following SAP Menu
Logistics -> Materials Management -> Purchasing -> Purchase Order -> Display
Transaction Code
ME23N
By typing above transaction code in transaction box, below screen is opened:
Always, last created/saved PO will be brought in the screen. To display a different PO, by clickingbutton, required PO number is written and button is clicked.
Sap User Change Log
Sap User Change History
Prepared By Beste Şahin.